Browsing Students by Subject "OVERTIME SYSTEM"
Now showing items 1-1 of 1
-
PERCEPATAN JADWAL MENGGUNAKAN SISTEM LEMBUR DENGAN PRECEDENCE DIAGRAMMING METHOD (STUDI KASUS : PROYEK PEMBANGUNAN BENDUNGAN PIDEKSO YANG TERLETAK DI KABUPATEN WONOGIRI PROVINSI JAWA TENGAH)
(FT UMY, 2020)In a construction project, time, cost, and quality are important things that must be considered so that delays in the project have a small percentage. The purpose of this study is to obtain the results of the analysis ...