Now showing items 5052-5071 of 24664

      Subject
      Duration Cost Trade off, Microsoft Project 2013, Additional Hours Overtime, Addition of Heavy Equipment and Labor, Cost, Time. Time Cost Trade off, Microsoft Project 2013, Penambahan Jam lembur, Penambahan Alat Berat dan Tenaga Kerja, Biaya, Waktu [1]
      Duration Cost Trade Off, Microsoft Project 2016, Penambahan Jam Lembur, Penambahan Alat Berat, Manajemen Proyek. [1]
      Duration Cost Trade off, Penjadwalan (scheduling), Penambahan Jam lembur, Penambahan Alat Berat, Biaya, Waktu [1]
      duration, cost, microsoft project, and time cost trade off. [1]
      Duration, Diabetes Mellitus, Diabetic Neuropathy. Durasi, Diabetes Melitus, Neuropati Diabetik [1]
      DURIAN [1]
      DUSUN TAMAN [1]
      Duterte, Philippines, Drug, Controversial, Policy [1]
      dynamic compression plate, stainless steel 316L, shot peening, microstructure , surface roughness, micro hardness, thickness. [1]
      Dynamics of CPO Exports, Issues of Forest Degradation, Indonesia's Foreign Policy Strategy. Dinamika Ekspor CPO, Isu Kerusakan Hutan, Strategi Politik Luar Negri Indonesia [1]
      DYSFUNCTIONAL AUDIT BEHAVIOR [2]
      DYSLEXIA STUDENTS [1]
      DYSMENORRHEA [1]
      dysmenorrhea, combination of calcium, decreased pain, quality of life [1]
      Dysmenorrhea, Kompres hangat , Obat gosok [1]
      Dysmenorrhea, Murottal Therapy, Aromatherapy lavender. [1]
      Dysmenorrhoea, BPI (Brief Pain Inventory), VAS (Visual Analoge Scale), Calcium, Vitamin B6, Vitamin D [1]
      dysmenorrhoea, knowledge, behaviour, self-medication [1]
      DZIKIR JAMA'I [1]
      Dzikir, Pain, Sectio Caesarea (SC). Dzikir, Nyeri, Sectio Caesarea (SC) [1]