Show simple item record

dc.contributor.authorNUGRAHA, ARY SATYA
dc.date.accessioned2018-05-11T02:14:45Z
dc.date.available2018-05-11T02:14:45Z
dc.date.issued2018-02-24
dc.identifier.urihttp://repository.umy.ac.id/handle/123456789/18716
dc.descriptionIndustri merupakan salah satu sektor yang mempengaruhi pertumbuhan laju ekonomi. Dengan berkembangnya sektor industri, tingkat pengangguran akan semakin berkurang. Namun dilain sisi, kapasitas penggunaan energi akan semakin meningkat karena proses produksi juga ikut meningkat. PT Dian Swastatika Sentosa Plant 1 Tbk Karawang merupakan salah satu industri yang bergerak dalam bidang pembangkitan energi listrik bertenaga uap. Dalam kelangsungan proses produksinya, diperlukan sistem proteksi yang handal, baik suplai daya listriknya, backup sistem kelistrikannya apabila terjadi gangguan. Koordinasi sistem proteksi OCR (Overcurrent Relay) diperlukan agar ketika terjadi gangguan hubung singkat, gangguan tidak meluas terhadap sistem ataupun merusak peralatan sistem, sehingga proses produksi tetap berjalan dengan normal. Pada penelitian ini membahas tentang identifikasi, analisa dan evaluasi sistem proteksi di PT Dian Swastatika Sentosa Plant 1 Tbk Karawang. Penelitian ini juga menggunakan software ETAP 12.6 sebagai simulator utama. Hasil simulasi sebelum dievaluasi menunjukkan ketika sistem proteksi disimulasikan pada software ETAP 12.6, sistem kurang memenuhi standar yang telah ditentukan yakni sistem proteksi tidak bekerja pada gangguan terdekatnya. Oleh sebab itu dilakukan perhitungan manual untuk mendapatkan hasil evaluasi yang baik pada sistem. Setelah dilakukan perhitungan manual, hasil simulasi menunjukkan bahwa sistem proteksi sudah memenuhi standar proteksi yang telah ditentukan.en_US
dc.description.abstractIndustry is one of the sectors affecting economic growth rate. With the development of industrial sector, unemployment rate will decrease. But on the other hand, the capacity of energy use will increase as the production process also increases. Dian Swastatika Sentosa Plant 1 Tbk Karawang company is one of the industries engaged in the generation of steam powered electricity. In the continuity of the production process, required a reliable protection system, both the supply of electrical power, backup electrical system in case of interference. Coordination of the OCR (Overcurrent Relay) protection system is required so that when a short circuit occurs, the disturbance does not extend to the system or damage the system equipment, so the production process remains normal. In this study discusses the identification, analysis and evaluation of protection systems in Dian Swastatika Sentosa Plant 1 Tbk Karawang company. This study also uses ETAP 12.6 software as the main simulator. The simulated results before being evaluated indicate when the protection system is simulated in the ETAP software, the system does not meet the specified standard ie the protection system does not work at its nearest disturbance. Therefore, manual calculation is done to get a good evaluation result on the system. After the manual calculation, the simulation results show that the protection system meets the specified protection standard.en_US
dc.publisherFT UMYen_US
dc.subjectIndustry, Protection System, Overcurrent Relay, ETAP 12.6. Industri, Sistem Proteksi, Overcurrent Relay, ETAP 12.6en_US
dc.titleANALISIS KOORDINASI PROTEKSI OVERCURRENT RELAY (OCR) PADA SISTEM KELISTRIKAN INDUSTRI DI PT. DIAN SWASTATIKA SENTOSA PLANT 1 TBK KARAWANGen_US
dc.typeThesis SKR F T 062en_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record