Toggle navigation
Toggle navigation
Browsing Faculty of Engineering by Subject
UMY Repository
03. DISSERTATIONS AND THESIS
Students
Undergraduate Thesis
Faculty of Engineering
Browsing Faculty of Engineering by Subject
UMY Repository
03. DISSERTATIONS AND THESIS
Students
Undergraduate Thesis
Faculty of Engineering
Browsing Faculty of Engineering by Subject
JavaScript is disabled for your browser. Some features of this site may not work without it.
Browsing Faculty of Engineering by Subject
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Go
Order:
ascending
descending
Results:
5
10
20
40
60
80
100
Update
Now showing items 989-1008 of 3795
ascending
descending
5
10
20
40
60
80
100
Subject
DRY COATING
[1]
Drying, microwave oven, conventional oven, shell, fiber and empty bunches
[1]
DSpace, Rangking, UMY Repository. DSpace, Rangking, Repositori UMY
[1]
DUA FASE
[2]
dua fase, fluida, fraksi hampa, viskositas, pola aliran.
[1]
DUA SENSOR
[1]
DURABILITAS
[1]
DURASI
[1]
Durasi
[1]
Durasi Parkir, Kapasitas Ruang Parkir, Kebutuhan Ruang Parkir
[1]
DURATION COST TRADE OFF
[1]
Duration Cost Trade Off , Microsoft Project 2010, Penambahan Jam Lembur, dan penambahan tenaga kerja.
[1]
Duration Cost Trade Off Method, Addition Off Overtime, Project Management
[1]
Duration Cost Trade off, Microsoft Project 2010, Additional Hours Overtime, Addition of Heavy Equipment and Labor, Cost, Time
[1]
Duration Cost Trade Off, Microsoft Project 2013, Add hours of overtime and labor, time, cost.
[2]
Duration Cost Trade off, Microsoft Project 2013, Additional Hours Overtime, Addition of Heavy Equipment and Labor, Cost, Time. Time Cost Trade off, Microsoft Project 2013, Penambahan Jam lembur, Penambahan Alat Berat dan Tenaga Kerja, Biaya, Waktu
[1]
Duration Cost Trade Off, Microsoft Project 2016, Penambahan Jam Lembur, Penambahan Alat Berat, Manajemen Proyek.
[1]
Duration Cost Trade off, Penjadwalan (scheduling), Penambahan Jam lembur, Penambahan Alat Berat, Biaya, Waktu
[1]
duration, cost, microsoft project, and time cost trade off.
[1]
dynamic compression plate, stainless steel 316L, shot peening, microstructure , surface roughness, micro hardness, thickness.
[1]
Search UMY Repository
This Community
Browse
All of UMY Repository
Collections
By Issue Date
Authors
Titles
Subjects
This Community
By Issue Date
Authors
Titles
Subjects
My Account
Login