Browsing Faculty of Engineering by Author "RAHAYU, ATIK"
Now showing items 1-1 of 1
-
ANALISIS BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF ( Studi Kasus : Pekerjaan Proyek Pembangunan Hotel Tosan Solo Baru (Lantai 5 – Lantai 9))
RAHAYU, ATIK (FT UMY, 2017-04)Benchmark for the success of a project is seen by short turnaround time at minimal cost without leaving the quality of work. Systematic project management is required to ensure the project implementation time in accordance ...