Browsing Faculty of Engineering by Author "RAMADHANI, EVIT"
Now showing items 1-1 of 1
-
ANALISIS METODE TIME COST TRADE OFF PADA PROYEK KONSTRUKSI, STUDI KASUS: PROYEK PEMBANGUNAN JEMBATAN TPA TALUMELITO, GORONTALO
RAMADHANI, EVIT (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-01)The success of a project is influenced by factors, including a short completion time and a small cost but does not eliminate the element of the quality of work that will be produced at the end of the job. Project time and ...