ANALISIS METODE TIME COST TRADE OFF PADA PROYEK KONSTRUKSI, STUDI KASUS: PROYEK PEMBANGUNAN JEMBATAN TPA TALUMELITO, GORONTALO
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-01)The success of a project is influenced by factors, including a short completion time and a small cost but does not eliminate the element of the quality of work that will be produced at the end of the job. Project time and ... -
PERCEPATAN PROYEK JEMBATAN MENGGUNAKAN METODE TIME COST TRADE OFF DENGAN PENAMBAHAN JAM KERJA DAN JUMLAH ALAT PADA PROYEK JEMBATAN TALILO CS
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-22)The success of a construction project is influenced by two important factors, duration of completion of the project briefly and at a minimal cost but do not eliminate the quality element of the work that will be generated ...