Search 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Search
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Search
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Search

      Show Advanced FiltersHide Advanced Filters

      Filters

      Use filters to refine the search results.

      Now showing items 1-1 of 1

      • Sort Options:
      • Relevance
      • Title Asc
      • Title Desc
      • Issue Date Asc
      • Issue Date Desc
      • Results Per Page:
      • 5
      • 10
      • 20
      • 40
      • 60
      • 80
      • 100
      Thumbnail

      ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (Studi kasus: Pembangunan Rumah Sakit Umum Daerah Belitung, Desa Aik Rayak, Tanjung Pandan) 

      NOVITASARI, VIEN (FT UMY, 2014-02-07)
      Pada era globalisasi terdapat banyak proyek konstruksi yang dilaksanakan di indonesia dalam pelaksanaannya sering terjadi ketidaksesuaian jadwal antara kondisi di lapangan dengan yang direncanakan . hal ini menyebabkan ...

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Discover

      AuthorNOVITASARI, VIEN (1)Subject
      JAM KERJA OPTIMUM (1)
      PERCEPATAN PELAKSANAAN (1)
      PROYEK KONSTRUKSI (1)
      ... View MoreDate Issued
      2014 (1)

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV