Search 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Search
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Search
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Search

      Show Advanced FiltersHide Advanced Filters

      Filters

      Use filters to refine the search results.

      Now showing items 1-1 of 1

      • Sort Options:
      • Relevance
      • Title Asc
      • Title Desc
      • Issue Date Asc
      • Issue Date Desc
      • Results Per Page:
      • 5
      • 10
      • 20
      • 40
      • 60
      • 80
      • 100
      Thumbnail

      ANAISA WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN VARIASI PENAMBAHAN JAM KERJA (LEMBUR) (Studi kasus : Pekerjaan Pembangunan Jembatan Padangan-Kasiman Kabupaten Bojonegoro) 

      SARTIKA, SARTIKA (FT UMY, 2014-08-25)
      Waktu dan biaya sangat berpengaruh terhadap keberhasilan dan kegagalan suatu proyek. Tolak ukur keberhasilan proyek biasanya dilihat dari waktu penyelesaian yang singkat dengan biaya yang minimal tanpa meninggalkan mutu ...

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Discover

      AuthorSARTIKA, SARTIKA (1)Subject
      lembur (1)
      PROYEK KONSTRUKSI (1)
      VARIASI PENAMBAHAN JAM KERJA (LEMBUR) (1)WAKTU PELAKSANAAN (1)... View MoreDate Issued
      2014 (1)

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV