Toggle navigation
Toggle navigation
Browsing Department of Civil Engineering by Subject
UMY Repository
03. DISSERTATIONS AND THESIS
Students
Undergraduate Thesis
Faculty of Engineering
Department of Civil Engineering
Browsing Department of Civil Engineering by Subject
UMY Repository
03. DISSERTATIONS AND THESIS
Students
Undergraduate Thesis
Faculty of Engineering
Department of Civil Engineering
Browsing Department of Civil Engineering by Subject
JavaScript is disabled for your browser. Some features of this site may not work without it.
Browsing Department of Civil Engineering by Subject
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Go
Order:
ascending
descending
Results:
5
10
20
40
60
80
100
Update
Now showing items 405-424 of 1444
ascending
descending
5
10
20
40
60
80
100
Subject
DISTANCE STRUCTURAL SEPARATION
[1]
DOBLE RING INFILTROMETER
[1]
double ring infiltrometer, kapasitas infiltrasi, koefisien permeabilitas (K), kepadatan tanah lapangan, kadar air
[1]
Drainase
[1]
drainase, tinggi jagaan (freeboard).
[1]
DROP PANEL
[1]
DROP PANELS
[1]
DRY COATING
[1]
DURABILITAS
[1]
DURASI
[1]
Durasi Parkir, Kapasitas Ruang Parkir, Kebutuhan Ruang Parkir
[1]
DURATION COST TRADE OFF
[1]
Duration Cost Trade Off , Microsoft Project 2010, Penambahan Jam Lembur, dan penambahan tenaga kerja.
[1]
Duration Cost Trade Off Method, Addition Off Overtime, Project Management
[1]
Duration Cost Trade off, Microsoft Project 2010, Additional Hours Overtime, Addition of Heavy Equipment and Labor, Cost, Time
[1]
Duration Cost Trade Off, Microsoft Project 2013, Add hours of overtime and labor, time, cost.
[2]
Duration Cost Trade off, Microsoft Project 2013, Additional Hours Overtime, Addition of Heavy Equipment and Labor, Cost, Time. Time Cost Trade off, Microsoft Project 2013, Penambahan Jam lembur, Penambahan Alat Berat dan Tenaga Kerja, Biaya, Waktu
[1]
Duration Cost Trade Off, Microsoft Project 2016, Penambahan Jam Lembur, Penambahan Alat Berat, Manajemen Proyek.
[1]
Duration Cost Trade off, Penjadwalan (scheduling), Penambahan Jam lembur, Penambahan Alat Berat, Biaya, Waktu
[1]
duration, cost, microsoft project, and time cost trade off.
[1]
Search UMY Repository
This Collection
Browse
All of UMY Repository
Collections
By Issue Date
Authors
Titles
Subjects
This Collection
By Issue Date
Authors
Titles
Subjects
My Account
Login