Now showing items 1420-1439 of 1444

      Subject
      WAKTU PERENDAMAN [2]
      WAKTU PROYEK KONSTRUKSI [1]
      WAKTU TEMPUH [1]
      waktu, biaya, microsoft project, dan time cost trade off. [1]
      warehouse, work accident, K3, steel construction, risk value [1]
      WARUNG TENDA [1]
      water surface elevation, discharge, return period, full bank capacity, RMA2. [1]
      water surface elevation, full bank capacity, discharge, return period, RMA2. [1]
      Water surface, tidal, Handil Bakti, swampland, numerical modelling. Muka air, pasang surut, Handil Bakti, lahan rawa, pemodelan numerik. [1]
      WATER TREATMENT [1]
      water treatment, electrolysis process, pH, TDS [1]
      Watershed, The Physical Characteristics of Watershed, Digital Elevation Model, ArcGIS, SRTM 1 Arc Second, Watershed Boundaries, Networking Stream, Slope, Land Use, Soil Types. Daerah Aliran Sungai, Karakteristik fisik DAS, Digital Elevation Model, ArcGIS, SRTM 1 Arc Second, Batas DAS, Jejaring Aliran, Kemiringan Lahan, Tataguna Lahan, Jenis Tanah. [1]
      Weathering, mudrock, durability, slake durability index, cement. [1]
      weir stability, flow net method, seepage, pipping. stabilitas bendung, metode jaringan aliran, rembesan, erosi bawah tanah [1]
      wetting-drying cycle, unconfined compressive test, fiber reinforcement, secant modulus of elasticity, brittleness index. siklus pembasahan-pengeringan, uji tekan bebas, perkuatan serat plastik, secant modulus of elasticity, brittleness index [1]
      WILAYAH GEMPA 2 [1]
      Work Accidents, OHS Implementation, Risk Management [1]
      Working Safety and Health, Disater, Risk [1]
      World Seismic Safety Initiative, [1]
      WSSI. [1]