STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Jembatan Grindulu (MYC), Kabupaten Pacitan, Jawa Timur)
(FT UMY, 2017-04-06)There are three factors that influences the succesfull and failure of the project construction, there are time, cost, and quality. The project is succesfull if the time completion of project with the minimum cost without ...