Browsing Department of Civil Engineering by Subject "cost, time, the addition of working hours (overtime), the addition of labor, microsoft project 2010, time cost trade of. biaya, waktu, penambahan jam kerja (lembur), penambahan tenaga kerja, microsoft project 2010, time cost trade off."
Now showing items 1-1 of 1
-
STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE TIME COST TRADE OFF PADA PEMBANGUNAN HOTEL WHIZ PRIME LAMPUNG
(FT UMY, 2018-05-30)The optimization of costs and time is very important to construction activities. It is used as a planning to get the best cost and time so that the optimal benefit of the project. To achieve the advantage then do steps to ...