Now showing items 1-1 of 1

    • LOAD SHARING PADA OPERASI PARALEL GENERATOR DI PLTU SURALAYA 

      HADITYA, RENDI (FT UMY, 2018-05-19)
      Significant load changes on the electricity system, resulted it running outside of the stable limit, so that the stability of the system is necessary, because of the problem, in this Final Project required research to get ...