dc.contributor.advisor | JAMAL, AGUS | |
dc.contributor.advisor | SURIPTO, SLAMET | |
dc.contributor.author | WICAKSONO, WAHYU NUGROHO | |
dc.date.accessioned | 2018-10-25T05:40:46Z | |
dc.date.available | 2018-10-25T05:40:46Z | |
dc.date.issued | 2018-10-08 | |
dc.identifier.uri | http://repository.umy.ac.id/handle/123456789/22616 | |
dc.description | Gedung Baru Universitas Aisyiyah Yogyakarta adalah salah satu bangunan
komersial yang bergerak bidang pendidikan di Yogyakarta. Gedung Baru
Universitas Aisyiyah Yogyakarta terdiri dari 10 lantai, termasuk lantai basement,
lantai utama dan lantai atap. Beban-beban listrik yang terpasang pada Gedung Baru
Universitas Aisyiyah Yogyakarta antara lain beban penerangan (lampu-lampu)
serta beban tenaga (stop kontak) dan beban tenaga motor-motor listrik (AC, lift dan
lain-lain), yang tentunya membutuhkan suplai daya listrik yang cukup besar. Daya
listrik yang terpasang di Gedung Baru Universitas Aisyiyah Yogyakarta sebesar
1010,9 kVA. Daya yang disuplai sebesar 800 kVA dari PLN dan kapasitas total
daya pada transformator sebesar 1000 kVA dan generator-set berkapasitas sebesar
1000 kVA. Dimana sistem back up suplai daya listriknya di suplai penuh oleh
generator-set. | en_US |
dc.description.abstract | New Building Aisyiyah University Yogyakarta is one of the commercial
buildings that move the field of education in Yogyakarta. The New Building of
Aisyiyah University Yogyakarta consists of 10 floors, including the basement floor,
main floor and roof floor. Electric loads installed at the New Building of Aisyiyah
University Yogyakarta include lighting loads (lights) and power loads (socket) and
the power load of electric motors (air conditioners, elevators and others), which of
course requires power supply big enough electricity. Electricity installed in the New
Building of Aisyiyah University in Yogyakarta is 1010.9 kVA. The power supplied
is 800 kVA from PLN and the total power capacity of the transformer is 1000 kVA
and a generator-set with a capacity of 1000 kVA. Where the backup power supply
system is fully supplied by the generator set. | en_US |
dc.publisher | FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA | en_US |
dc.subject | Electrical Installation, Artificial Lighting, Short-circuit Current, Power Distribution, Drop Voltage | en_US |
dc.title | PERANCANGAN SISTEM DAN INSTALASI LISTRIK GEDUNG BARU UNIVERSITAS AISYIYAH YOGYAKARTA | en_US |
dc.type | Thesis
SKR
F T
349 | en_US |