dc.contributor.advisorSYAHPUTRA, RAMADONI
dc.contributor.advisorMUJAHID, FAARIS
dc.contributor.authorWICAKSONO, DIMAS BAYU
dc.date.accessioned2019-04-11T03:01:25Z
dc.date.available2019-04-11T03:01:25Z
dc.date.issued2019-03-18
dc.identifier.urihttp://repository.umy.ac.id/handle/123456789/25962
dc.descriptionSkripsi ini dibuat sebagai bagian dari pengaplikasian mata kuliah Teknologi Pembangkit Tenaga Listrik dan Perencanaan Sistem Kelistrikan Industri pada program studi S-1 Teknik Elektro di Universitas Muhammadiyah Yogyakarta. Ini menghitung dan merancang sistem pembangkit listrik tenaga surya dengan mengikuti kaidah keilmuan energi terbarukan khususnya teknologi energi surya dan kelistrikan. Skema umum yang digunakan dalam perencanaan sistem Pembangkit Listrik tenaga Surya ini berdasarkan data dan kebutuhan lokasi. Data lokasi berupa kebutuhan atau batasan penggunaan beban listrik dan iradiasi matahari yang diambil dari data sekunder. Berdasarkan perolehan data dan perhitungan akan dilakukan perencanaan kapasitas pembangkit, pemilihan spesifikasi komponen, desain teknis sistem dan analisis ekonomi. Hasil perhitungan dan analisis pada perencanaan sistem Pembangkit Listrik Tenaga Surya pada penelitian ini dibuat untuk memfasilitasi kebutuhan listrik untuk 150 rumah dan 34 fasilitas umum. Dari hasil perhitungan dengan total kebutuhan daya listrik sebesar 845.591,7 Wh/hari yang dapat dilayani dengan Pembangkit Listrik Tenaga Surya ini. Pada perencanaan sistem ini, dibuat menggunakan konfigurasi sistem off-grid DC coupling memakai 723 panel surya berkapasitas 330 Wp, 72 buah baterai berkapasitas 1156 Ah dengan sistem 48 V, 1 buah central inverter berkapasitas 250 kW dan 40 buah solar charge controller yang masing-masing memiliki output 100 A. Biaya untuk investasi Pembangkit Listrik Tenaga Surya tersebut adalah Rp.9.682.387.073, biaya pemeliharaan beserta operasional adalah sebesar Rp. 234.080.000 per tahun dan biaya 2 kali pergantian baterai pada tahun ke-9 dan ke-18 sebesar Rp. 2.061.545.904en_US
dc.description.abstractThis study was made as part of the application of “Teknologi Pembangkit Tenaga Listrik” (the electronica power technology) and “Perencanaan Sistem Kelistrikan Industri” (Industrial Electrical System Planning) courses at undergraduate electrical engineering in Muhammadiyah University of Yogyakarta. It calculates and designs solar power generation systems by following the scientific rules of renewable energy, especially solar energy technology and electricity. The general scheme used in this solar power plant system planning is based on data and location needs. Location data in the form of need or limits on the use of electric loads and solar irradiation has taken from secondary data. Based on the data result and the calculation will be carried out generation capacity planning, component specification selection, system technical design, and economic analysis. The results of calculations and analysis on the planning of the Solar Power Plant system in this study were made to facilitate electricity needs for 150 houses and 34 public facilities. From the results of calculations with the total electricity needs of 845,591.7 Wh / day that can be served with this Solar Power Plant. In planning this system, it is made using a DC coupling off-grid system configuration using 723 solar panels with a capacity of 330 Wp, 72 1156 Ah capacity batteries with a 48 V system, 1 central inverter with a capacity of 250 kW and 40 solar charge controllers each has an output of 100 A. The cost of investing in the Solar Power Plant is Rp.9, 682,387,073, maintenance costs and operations are Rp.234, 080,000 per year and the cost of 2 times the change of battery in the 9th and 18th years is Rp.2, 061,545,904.en_US
dc.publisherFAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTAen_US
dc.subjectSolar Power Plant, Module PV, Renewable Energien_US
dc.titleANALISIS DESAIN PEMBANGKIT LISTRIK TENAGA SURYA MENGGUNAKAN APLIKASI PVSYST DI PANTAI INDRAYANTI, GUNUNGKIDULen_US
dc.typeThesis SKR 178en_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record