PENGARUH FREKUENSI GEMPA TERHADAP RESPONS BANGUNAN BERTINGKAT
(UMS Solo, 2015-05-19)
Kerusakan struktural akibat gempa tidak semata-mata fungsi dari besarnya percepatan tanah akibat
gempa. Faktor penyebab besarnya kerusakan struktur adalah karakteristik gempa, karakteristik site,
dan karakteristik struktur. ...
PEMODELAN SKALA KECIL DAN ANALISIS NUMERIS SISTEM PELAT TERPAKU PADA TANAH EKSPANSIF
(Himpunan Ahli Teknik Tanah Indonesia, 2016-08-11)
The expansive soil is considered one of the most common causes of pavement distresses. Therefore, the expansive soil undergoes swelling and shrinking caused by moisture fluctuation. Ordinarily, piles have been used extensively ...
STUDI EKSPERIMENTAL UNJUK KERJA SLING PUMPJENIS KERUCUT DENGAN VARIASI JUMLAH INLET MEMAKAI LILITAN PIPA TEMBAGA
(2010)
Sling Pump represent the pump by construct the trapeze which its surface is given by the pipe circumference or
certain period. One of the form of exploiting of energy of river stream that is to turn around the propeler ...
MODEL PEMBANGKIT LISTRIK TENAGA ANGIN
(ITS, 2017)
In this paper,a wind power generation model using the doubly-fed induction generator (DFIG) system as a unit of distributed generator is presented. The wind turbine driven by DFIG is a part of distributed generation ...
SOSIALISASI PKM 2015 (DIDANAI 2016)
(2015-11-11)
sosialisasi tentang pendanaan kepada mahasiswa lewat prestasi dan beasiswa untuk mahasiswa yang kreatif dan berprestasi
3G RADIO NETWORK PLANNING
(2015-11)
Mobile Communication Technology
3G RNP Overview
RNP Concept –Step Radio Network Planning –GSM, 3G, and LTE Differences
Radio Network Dimensioning –Link Budget Calculation
Simulation
Analysis
DESIGN OF PSS BASED ON ADAPTIVE NEURO-FUZZY METHOD
(2011)
A contemporary solution to this problem is the addition of power system stabilizers (PSS) to the automatic
voltage regulators on the generators in the power system. The damping provided by this additional stabilizer
provides ...
DESIGN OF PSS BASED ON ADAPTIVE NEURO-FUZZY METHOD
(2011)
A contemporary solution to this problem is the addition of power system stabilizers (PSS) to the automatic
voltage regulators on the generators in the power system. The damping provided by this additional stabilizer
provides ...
OPTIMISASI SISTEM DISTRIBUSI DAYA LISTRIK
(ITS, 2017)
Penelitian ini mengusulkan suatu metode untuk optimisasi sistem distribusi daya listrik menggunakan metode ANFIS. Fungsi objektif yang digunakan adalah berfungsi untuk minimisasi losses daya aktif, deviasi ...