dc.description | The multi-storey building construction project is very specific both in terms of quality
and time costs that have different characteristics and risks, so arrangements are needed to get
maximum and efficient results. Time is one of the benchmarks for project success and cost
achievement benchmarks, so it is necessary to identify the risk of vulnerability in the time of a
multi-storey building project work, so that concepts or methods are needed to identify the risk of
delays in order to obtain certainty that is by way of a matrix risk formula. from the results of
identification in the construction project of Campus C University Building 'Aisyiyah
Yogyakarta, factors that resulted in the sustainability of the project start from the limitations of
materials, the quality of labor and limited labor, of the three categories that occur at many
stages of the 5th floor structure work, where after identifying and doing calculations with the
risk matrix formula = ivent x empac get the number 7.21 which is included in the category of
low risk. Identification of the risk of extinction becomes very important in achieving the success
of a project, or become a reference and pilot to be used as a reference on other similar projects. | en_US |
dc.description.abstract | The multi-storey building construction project is very specific both in terms of quality
and time costs that have different characteristics and risks, so arrangements are needed to get
maximum and efficient results. Time is one of the benchmarks for project success and cost
achievement benchmarks, so it is necessary to identify the risk of vulnerability in the time of a
multi-storey building project work, so that concepts or methods are needed to identify the risk of
delays in order to obtain certainty that is by way of a matrix risk formula. from the results of
identification in the construction project of Campus C University Building 'Aisyiyah
Yogyakarta, factors that resulted in the sustainability of the project start from the limitations of
materials, the quality of labor and limited labor, of the three categories that occur at many
stages of the 5th floor structure work, where after identifying and doing calculations with the
risk matrix formula = ivent x empac get the number 7.21 which is included in the category of
low risk. Identification of the risk of extinction becomes very important in achieving the success
of a project, or become a reference and pilot to be used as a reference on other similar projects. | en_US |
dc.publisher | FT UMY | en_US |
dc.subject | MANAGEMENT | en_US |
dc.subject | RISK MATRIX | en_US |
dc.subject | HIGH RISE BUILDING PROJECT | en_US |
dc.subject | RISK | en_US |
dc.subject | TIME | en_US |
dc.title | EVALUASI RISIKO-RISIKO KETERLAMABATAN PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG KAMPUS C UNIVERSITAS ‘AISYIYAH YOGYAKARTA | en_US |
dc.type | Thesis | en_US |