dc.titleANALISIS BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus : Pekerjaan Pembangunan Jembatan Sungai Naik – Kabupaten Musi Rawas)en_US
dc.typeThesis SKR 245en_US