Show simple item record

dc.contributor.authorPUTRI, NARIYA SULISTYA
dc.date.accessioned2016-12-26T03:31:38Z
dc.date.available2016-12-26T03:31:38Z
dc.date.issued2016
dc.identifier.urihttp://repository.umy.ac.id/handle/123456789/7466
dc.descriptionThis research aims to determine how much influence the amount of labor, capital, wages, and long effort towards production craft teak in Ngawi and to determine whether these four factors have the most dominant influence on the production of handicrafts teak in Ngawi. In this study sample of 55 data obtained through interviews and questionnaires to employers craft teak in Ngawi. The analysis tool used is the Multiple Linear Regression Analysis. Based on the analysis that has been used to get the result that the variable amount of labor, capital, wages positive and significant effect while the old variable effort and no significant negative effect on the production of handicrafts teak in Ngawi. Among the four independent factor on the variable number of workers who heavily influence the production of handicrafts teak in Ngawi.en_US
dc.description.abstractThis research aims to determine how much influence the amount of labor, capital, wages, and long effort towards production craft teak in Ngawi and to determine whether these four factors have the most dominant influence on the production of handicrafts teak in Ngawi. In this study sample of 55 data obtained through interviews and questionnaires to employers craft teak in Ngawi. The analysis tool used is the Multiple Linear Regression Analysis. Based on the analysis that has been used to get the result that the variable amount of labor, capital, wages positive and significant effect while the old variable effort and no significant negative effect on the production of handicrafts teak in Ngawi. Among the four independent factor on the variable number of workers who heavily influence the production of handicrafts teak in Ngawi.en_US
dc.language.isootheren_US
dc.publisherFAKULTAS EKONOMI DAN BISNIS UMYen_US
dc.subjectTOTAL LABORen_US
dc.subjectCAPITALen_US
dc.subjectWAGESen_US
dc.subjectLONG EFFORTSen_US
dc.subjectPRODUCTIONen_US
dc.subjectINDUSTRIen_US
dc.titlePENGARUH JUMLAH TENAGA KERJA, MODAL, UPAH, DAN LAMA USAHA TERHADAP HASIL PRODUKSI INDUSTRI KERAJINAN KAYU JATI DI KABUPATEN NGAWIen_US
dc.typeThesis SKR 714en_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record