View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      OPTIMASI BIAYA DAN WAKTU PROYEK DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PEKERJAAN JEMBATAN LEMAH ABANG KABUPATEN SLEMAN

      Thumbnail
      View/Open
      COVER (156.1Kb)
      HALAMAN JUDUL (578.5Kb)
      HALAMAN PENGESAHAN (384.8Kb)
      ABSTRACT (103.1Kb)
      BAB I (116.7Kb)
      BAB II (732.1Kb)
      BAB III (419.6Kb)
      BAB IV (1.954Mb)
      BAB V (152.3Kb)
      DAFTAR PUSTAKA (213.4Kb)
      NASKAH PUBLIKASI (1.001Mb)
      Date
      2018-04-28
      Author
      AZKI, HANNY ULQIA QUEENE
      Metadata
      Show full item record
      URI
      http://repository.umy.ac.id/handle/123456789/19834
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV