View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS KEANDALAN KOMPONEN-KOMPONEN LISTRIK PADA PEMBANGKIT LISTRIK TENAGA SURYA DI PLTH BAYU BARU PANTAI BARU BANTUL DI YOGYAKARTA

      Thumbnail
      View/Open
      COVER (291.8Kb)
      HALAMAN JUDUL (1.194Mb)
      HALAMAN PENGESAHAN (641.2Kb)
      ABSTRAK (387.7Kb)
      HALAMAN PENGESAHAN (270.8Kb)
      BAB II (673.0Kb)
      BAB III (334.3Kb)
      BAB IV (1.204Mb)
      BAB V (144.6Kb)
      DAFTAR PUSTAKA (235.4Kb)
      LAMPIRAN (373.8Kb)
      NASKAH PUBLIKASI (909.3Kb)
      Date
      2018-05-28
      Author
      SAPUTRA, MELDI
      Metadata
      Show full item record
      Abstract
      This research entitled "Reliability analysis of Electric Components of Solar farm in PLTH Pantai Baru in Bantul, DI Yogyakarta" has been carried out in March to May 2018. The research was conducted to analyze the reliability of electrical components in PLTS system in PLTH Bayu Baru and analyze their impact on the energy generated.This research is done by observation and direct interview to the speakers related directly with PLTH Bayu Baru Bantul, Yogyakarta and also done by way of indirectly that is by taking data that exist in annual data of PLTH.PLTS system in PLTH Bayu Baru is very helpful to the development of new coastal community of Bantul Regency especially in economy area considering new beach is a tourist area but over time various kinds of damage that occur especially in the inverter caused by leakage AC current from wind turbine and other electrical components in PLTS system in PLTH Bayu Baru causing energy produced no longer as expected, so that the system in PLTH Bayu Baru is no longer as efficient asexpected, as in the western group which produces only 7,152 Kwh/day energy ideally 48 Kwh/day and the KKP group produces only 29,91 Kwh/day energy while ideally 38,72 Kwh/day. Need more attention from the government to overcome the damage to electrical components in the PLTS system in PLTH Bayu Baru to keep working optimally.
      URI
      http://repository.umy.ac.id/handle/123456789/20245
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV