View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS PENGGUNAAN ARRESTER SEBAGAI PENGAMAN TRASFORMATOR MENGGUNAKAN SOFTWARE ATP (ALTERNATIVE TRANSIENT PROGRAMME) DI GARDU INDUK 150 kV PURWOREJO

      Thumbnail
      View/Open
      COVER (22.41Kb)
      HALAMAN JUDUL (1.497Mb)
      HALAMAN PENGESAHAN (2.802Mb)
      ABSTRAK (149.1Kb)
      BAB I (448.0Kb)
      BAB II (1.132Mb)
      BAB III (219.3Kb)
      BAB IV (2.526Mb)
      BAB V (152.0Kb)
      DAFTAR PUSTAKA (374.5Kb)
      LAMPIRAN (1.219Mb)
      NASKAH PUBLIKASI (1.248Mb)
      Date
      2018-08-21
      Author
      SUPRAYITNO, JOKO
      Metadata
      Show full item record
      Abstract
      Electrical energy is a vital energy for survival in a country. In the course of time, problems arise that can be experienced in the management of electrical energy. One external problem that arises is that interference can cause interference with high voltage systems such as Transformers. One function for Transformers in the Substation is Arrester. The work system is by transferring further frequencies from being channeled to the ground. Arrester installed at 150 kV substation Purworejo with OHIO BRASS brand has a spark voltage of 650 kV, while the transformer installed at the substation has a BIL voltage of 715 kV. At this time the distance between arresters and transformers was measured according to the data in the field and obtained a distance of 9.75 meters. While the distance in Purworejo 150 kV Substation was 8 meters. Both values are still below the maximum values of the IEC standard (1958) and SPLN (1978: 4) with a value of 28.5 meters. However, the value of 8 meters in the 150 kV substation in Purworejo is more useful because the arrester is in a position closer to the transformer, the arrester with more than a better voltage. Then from the distance in the field and calculations are carried out simulation and analysis using ATP (Alternative Transient Program) software. The results obtained from the arrangement of arresters with a distance of 8 meters with a better voltage.
      URI
      http://repository.umy.ac.id/handle/123456789/22686
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV