View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS DAMPAK LALU LINTAS PADA RUAS JALAN TAMAN SISWA TERHADAP KEGIATAN RESTAURANT TEMPO GELATO DENGAN METODE MKJI 1997

      Thumbnail
      View/Open
      COVER (206.4Kb)
      HALAMAN JUDUL (469.9Kb)
      HALAMAN PENGESAHAN (82.57Kb)
      ABSTRAK (343.0Kb)
      BAB I (414.8Kb)
      BAB II (485.8Kb)
      BAB III (409.4Kb)
      BAB IV (635.4Kb)
      BAB V (384.0Kb)
      DAFTAR PUSTAKA (280.4Kb)
      LAMPIRAN (217.0Kb)
      NASKAH PUBLIKASI (368.2Kb)
      Date
      2018-12-10
      Author
      NUGRAHANING, ZAFFARIA DWI
      Metadata
      Show full item record
      Abstract
      City of Yogyakarta is a student city and a tourist city. It is one of the causes of the increase in developments and business activities,such as shop,hotels and restaurant.Foor example,the operation of tempo gelato restaurant,will be operated an Taman Siswa Street,this will certainly increase the volume of trafic and effect the perfoof road sections.Therefore this study will analyze the impact of road performance due the activities of the restaurant such as free flow speed,exsisting condition,operational condition and alternative condition.This research use MKJI 1997 Method and comparison method,tempo gelato restaurant kaliurang street used as comparison.From the result, DS when free flow speed is 28,71375 km/jam,DS when exsisting condition is 0,925911,DS when operational condition (without alternative 2018) is 0,940741, DS when operational step (with alternative 2018) first alternative is 0,88624, second alternative is 0,303651. DS when operational step (without alternative 2023 ) is 1,20065 and DS operational step (with alternative 2023) first alternative is 1,13109 and second alternative is 0,38754.
      URI
      http://repository.umy.ac.id/handle/123456789/23732
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV