View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PERMODELAN LALU LINTAS MENGGUNAKAN SOFTWARE PTV VISSIM 9.0-05 PADA BUNDARAN

      Thumbnail
      View/Open
      COVER (654.0Kb)
      HALAMAN JUDUL (654.0Kb)
      HALAMAN PENGESAHAN (102.7Kb)
      ABSTRAK (10.69Kb)
      BAB I (14.85Kb)
      BAB II (313.6Kb)
      BAB III (1.122Mb)
      BAB IV (1.467Mb)
      BAB V (114.5Kb)
      DAFTAR PUSTAKA (200.2Kb)
      LAMPIRAN (1.714Mb)
      NASKAH PUBLIKASI (705.0Kb)
      Date
      2018-09-30
      Author
      TAZLIMAN, TAZLIMAN
      Metadata
      Show full item record
      Abstract
      As time goes by,the need of transportation demand a better service quality, so the basic needs of traffic like : safe,smooth,comfortable,and economics can be fulfilled. To determined the roundabout performance,need to do research about geometric and also the vehicles that rust past the traffic. The data analisyt was conducted using simulator program which is PTV vissim where existing condition in the field are simulated by software PTV vissim for analyze roundabout performance, then use the alternative 1 (current closure) and alternative 2 (the combination between current closure and traffic light) for knowing the defference between exixting condition with that 2 alternatives. The result of existing condition analisys that queue length 104,41 m, vehicle delay 71,35 second, and level of servis F. And the result from alternative 1 condition current closure that queue length are 88,96 m from 104,41 m, vehicle delay 77,25 from 71,35 second, and level of service F. And result from the alternative 2 combination of traffic light and current closure that queue length 83,36 m, vehicle delay 60,3 second, level of service E.
      URI
      http://repository.umy.ac.id/handle/123456789/25641
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV