View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA DI GEDUNG MUHAMMADIYAH BOARDING SCHOOL DI PRAMBANAN DAERAH ISTIMEWA YGYAKARTA

      Thumbnail
      View/Open
      COVER (20.29Kb)
      HALAMAN JUDUL (1.380Mb)
      HALAMAN PENGESAHAN (2.599Mb)
      ABSTRAK (147.1Kb)
      BAB I (268.5Kb)
      BAB II (695.5Kb)
      BAB III (669.6Kb)
      BAB IV (1.494Mb)
      BAB V (151.6Kb)
      DAFTAR PUSTAKA (247.6Kb)
      LAMPIRAN (506.1Kb)
      NASKAH PUBLIKASI (739.4Kb)
      Date
      2019-07-27
      Author
      ERLANGGA, BANGKIT DWIPUTRA
      Metadata
      Show full item record
      Abstract
      The high demand for electrical energy now results in an increasing need for Indonesia's electricity consumption annually. By designing solar power plants in Indonesia, it can be one solution to overcome the problem of increasing electricity consumption in Indonesia at this time. To find out the needs of the user can use the data collection method by interviewing directly to the manager of the Muhammadiyah Boarding School (MBS) in the electricity section or by manually calculating the amount of electricity load. For the method carried out at the Muhammadiyah Boarding School location, it used the method of interviewing directly with the MBS administrator in the electricity department. Based on the acquisition of data and calculations, it will do generating capacity planning, component selection, technical design, and economic analysis. The results of the calculation and analysis of the PLTS system design are made to supply electrical energy to lights and computers on SBM. From the results of the calculation of the total need for electric power of 193 kWh, in one day can be supplied using PLTS with a capacity of 55kWp. The design of this system uses a configuration of 172 solar panels with a capacity of 320 Wp, 120 12 volt batteries with a capacity of 105 Ah and a total cost of PLTS investment of Rp. 2928,487,629, - and maintenance and operational costs of Rp. 222,292,400 per year.
      URI
      http://repository.umy.ac.id/handle/123456789/28738
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV