      PENILAIAN RISIKO KETERLAMBATAN PADA PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CLUSTER VERDI SUMMARECON SERPONG

      Thumbnail
      View/Open
      COVER (102.7Kb)
      HALAMAN JUDUL (739.1Kb)
      HALAMAN PENGESAHAN (255.1Kb)
      ABSTRAK (115.4Kb)
      BAB I (78.52Kb)
      BAB II (256.2Kb)
      BAB III (2.070Mb)
      BAB IV (1.458Mb)
      BAB V (13.46Kb)
      DAFTAR PUSTAKA (82.41Kb)
      LAMPIRAN (902.6Kb)
      NASKAH PUBLIKASI (300.9Kb)
      Date
      2019-03-15
      Author
      DEVEDO, MOCHAMAD GAHARU DIDA
      Metadata
      Show full item record
      Abstract
      Risk is a function of danger, exposures, and consequences. Risk is often considered to be related with negative things such as loss, danger, and other consequences. The project of housing construction is a quite sophisticated project so that it has many risks. This research aims to identify and assess the risk factors which may cause delay, identify the types of risks which frequently occurs in the implementation of housing construction project of Verdi Summarecon Cluster. Work Breakdown Structure, field observation, and interview were conducted to identify the possibility of occurrences and consequences. The risk value is investigated with the approach of risk=likelihood x consequences. Then, the mentioned approach result is described in the ratio matrix. The research results show that the job having the highest delay risk is the roof job with the average risk value which is 6.75. Meanwhile, the plafond job has the average risk value of 6. The most frequent risk identified is the low risk having the amount of risks which is 96 while the moderate risk has 56 risks.
      URI
      http://repository.umy.ac.id/handle/123456789/28799
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV