View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      STUDI ANALISIS KOORDINASI PROTEKSI RELE DIFFERENTIAL DAN RELE OVERCURRENT PADA TRANSFORMATOR UNTUK MENGHINDARI KEGAGALAN PROTEKSI DENGAN MENGGUNAKAN SOFTWARE ETAP 12.6

      Thumbnail
      View/Open
      COVER (75.93Kb)
      HALAMAN JUDUL (306.0Kb)
      HALAMAN PENGESAHAN (187.8Kb)
      ABSTRAK (8.670Kb)
      BAB I (116.7Kb)
      BAB II (809.8Kb)
      BAB III (31.36Kb)
      BAB IV (867.7Kb)
      BAB V (10.84Kb)
      DAFTAR PUSTAKA (116.2Kb)
      LAMPIRAN (401.8Kb)
      NASKAH PUBLIKASI (351.1Kb)
      Date
      2019-03-27
      Author
      DAHLAN, MUHAMMAD ABDUH
      Metadata
      Show full item record
      Abstract
      An electric power system has a substation which is an important part of receiving electrical energy from the plant and then distributing it to consumers, where the substation has electrical equipment to support the process of sending electrical energy which if not properly protected when a disturbance occurs can damage the equipment and have the price is quite expensive, so that a good electrical protection system is needed, which is selective, sensitive, fast, reliable, and economical to maximize shipping that is able to feel, provide the reliability of electric power distribution systems and minimize interference and damage especially in main transformers. In this final project research discusses the analysis of differential relay coordination coordination as the main safety and overcurrent relay as a backup and overcurrent protection on the transformer to avoid protection failure by comparing the results of manual setting calculation data and installed settings in the field then performing simulation using ETAP software 12.6 to find out the simulation of the relay relay. Overcurrent relay is used as overcurrent protection relay which will describe the circuit breaker when the current exceeds the limit value setting against two secondary CT currents that are used against interference in the protection zone.
      URI
      http://repository.umy.ac.id/handle/123456789/28839
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV