      ANALISIS BANGKITAN DAN TARIKAN PADA RENCANA PEMBANGUNAN GEDUNG JOGJA PLANNING GALERY

      Thumbnail
      View/Open
      COVER (83.04Kb)
      HALAMAN JUDUL (226.0Kb)
      HALAMAN PENGESAHAN (70.34Kb)
      ABSTRAK (160.7Kb)
      BAB I (39.81Kb)
      BAB II (256.8Kb)
      BAB III (265.7Kb)
      BAB IV (234.2Kb)
      BAB V (129.4Kb)
      DAFTAR PUSTAKA (114.3Kb)
      LAMPIRAN (233.2Kb)
      NASKAH PUBLIKASI (398.2Kb)
      Date
      2019-07-03
      Author
      MIFTAHUDDIN, MUHAMMAD
      Metadata
      Show full item record
      Abstract
      Yogyakarta as a center for cultural heritage, especially Java needs to be packaged and informed to the public in a good and intact manner. In this case, the DIY local government has an interest in establishing the Jogja Planning Galery Urban Development Planning Information Center as an information center or institution that is expected to provide information on urban development planning in Yogyakarta both past, present, and future. In this study, we will examine the Generating and Attractive Analyze plan at the Jogja Planning Gallery using a comparison of the Cultural Park building and the Yogyakarta Tourism Office. The purpose of this study is Analyzing Generations and Pulling Jogja Planning Gallery as a comparison of the Cultural Parks and Yogyakarta Tourism Office. The method used is the comparison method of the Jogja Planning Gallery by using Cultural Park data and the Yogyakarta Tourism Office. The results of the Generating and Pulling Jogja Planning Gallery calculation results obtained from the vehicles that came out (generated) Jogja Planning Gallery is 133,1058 vehicles/hour ≈ 133 vehicles/hour. With a percentage of 17% for LV and 83% for MC, so the number of each type of vehicle is MC: 110 vehicles/hour and LV: 22 vehicles/hour. Whereas the vehicles that enter (pull) Jogja Planning Gallery are 116,7752 vehicles/hour ≈ 116 vehicles/hour. With a percentage of 17% for LV and 83% for MC with divided types of vehicles, the results of MC: 96 vehicles/hour and LV: 19 vehicles/hour.
      URI
      http://repository.umy.ac.id/handle/123456789/28930
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV