View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Mechanical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Mechanical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PERANCANGAN ULANG SISTEM INSTALASI PERPIPAAN AIR KOTOR/AIR BEKAS DI GEDUNG PASCA SARJANA UNIVERSITAS MUHAMMADIYAH YOGYAKARTA

      Thumbnail
      View/Open
      COVER (26.01Kb)
      HALAMAN JUDUL (472.7Kb)
      HALAMAN PENGESAHAN (503.7Kb)
      ABSTRAK (88.88Kb)
      BAB I (158.2Kb)
      BAB II (566.4Kb)
      BAB III (108.5Kb)
      BAB IV (1.085Mb)
      BAB V (191.3Kb)
      DAFTAR PUSTAKA (86.74Kb)
      NASKAH PUBLIKASI (2.951Mb)
      NASKAH PUBLIKASI (533.4Kb)
      Date
      2018-12-18
      Author
      SAPUTRA, BAYU ANGGA
      Metadata
      Show full item record
      Abstract
      Plumbing system is an inseparable part of a multi-storey building. Besides, the plumbing system is used to provide clean water and dispose of sewage or waste water at a predetermined place without polluting other important parts. Also, the design and construction of a postgraduate building needs to pay attention to the installation system of sewage disposal or used water to all final disposals either septic tanks or infiltration wells. Therefore, the design of the research aims to get a design that will produce a more effective and efficient piping installation system. In this research, it discussed the methodology used by the researcher in this study. This design method in this study included about collecting data in the field, determining the number of employees’ and students’ needs in the postgraduate building, determining the diameter of dirty or used water pipes, plumbing paths in the building, calculating used water installation systems from the sink, calculating the overall dirty water installation system, and system sanitation. Thus, several theories were also included in this study to support the methodology in this study. Regarding the results of the redesigning towards the dirty water installation system or the former on four-floor post-graduate building which had been carried out, the number of plumbing tools which had been redesigned were more than the number of plumbing tools in the field. Besides, some diameter sizes were huge because it provided additional numbers of plumbing tools. Consequently, in general, the results of the redesign are as same as field results.
      URI
      http://repository.umy.ac.id/handle/123456789/28941
      Collections
      • Department of Mechanical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV