View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS SISTEM KOORDINASI PROTEKSI DENGAN MEMPERTIMBANGKAN SETTING OVER CURRENT RELAY (OCR) DAN GROUND FAULT RELAY (GFR) PADA PT. PLN (PERSERO) UITJBT UPT SALATIGA (ULTG) YOGYAKARTA

      Thumbnail
      View/Open
      COVER (22.91Kb)
      HALAMAN JUDUL (987.5Kb)
      HALAMAN PENGESAHAN (692.4Kb)
      ABSTRAK (13.29Kb)
      BAB I (24.95Kb)
      BAB II (1.141Mb)
      BAB III (100.4Kb)
      BAB IV (2.125Mb)
      BAB V (74.33Kb)
      DAFTAR PUSTAKA (84.01Kb)
      LAMPIRAN (1.405Mb)
      NASKAH PUBLIKASI (461.3Kb)
      Date
      2019-03-28
      Author
      AZMI, FEBI FAUZAN
      Metadata
      Show full item record
      Abstract
      The PLN Unit Layanan Transmisi dan Gardu Induk (ULTG) Yogyakarta has three transformer units in which each transformer has a capacity of 60 MVA, to serve loads in Bantul particularly and has an interconnected system because it is also a Basecamp substation in Yogyakarta. The PLN ULTG Yogyakarta can convert the voltage of 150 KV to 20 KV which in case it uses a step-down Transformer and then be channeled through the 20 KV feeder. For the maximizing the role of substation, especially in PLN ULTG Yogyakarta, each transformer must be installed with a protection system device. The protection system device to protect the transformer from failure is Relay Protection, detect a failure and send the signal to a circuit breaker (CB) or Pemutus Tenaga (PMT) to trip. The sort of Relay Protection device is Over Current Relay (OCR) and Ground Fault Relay (GFR). OCR function is detecting excess current and GFR is used to detect phase disturbances to the ground. Furthermore, this analysis uses a software called ETAP 16.0.0 for a simulation and testing the sensitivity of protection system at PLN ULTG Yogyakarta when got a failure. In order to be expected analytic result can show protection system in normal or abnormal condition
      URI
      http://repository.umy.ac.id/handle/123456789/29014
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV