View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PERANCANGAN INSTALASI LISTRIK GEDUNG HOTEL GRAND ZURI PADANG

      Thumbnail
      View/Open
      COVER (48.22Kb)
      HALAMAN JUDUL (498.1Kb)
      HALAMAN PENGESAHAN (1.016Mb)
      ABSTRAK (151.7Kb)
      BAB I (218.5Kb)
      BAB II (696.3Kb)
      BAB III (171.6Kb)
      BAB IV (1.591Mb)
      BAB V (203.6Kb)
      DAFTAR PUSTAKA (166.4Kb)
      LAMPIRAN (5.431Mb)
      NASKAH PUBLIKASI (602.5Kb)
      Date
      2019-01-28
      Author
      MURTI, RATNA
      Metadata
      Show full item record
      Abstract
      The picture of electric installation planning became the most important aspect that has to be measured accurately and designed well to fit with the valid electrical standard. Based on the reason, the researcher design the electric installation in Grand Zuri Hotel, Padang which has 8 floors. This design covers all of the electric utilities, such as lightning installation and electrical outlet; VAC electrical power supply (arrangement of air and mechanical ventilation); electrical supply (fire alarm, sound system, phone network, and CCTV camera); electrical device supplies (clean water pump, hydrant pump, warm hater and lift); low voltage transformer; and diesel generator. Based on the result of the design, the amount of the power that must be installed is 425 kW with 0.5 of power factor and 850 kVA of reactive power. Based on the total power in the building, the installed transformer capacity and generator must be 600 kVA and must subscribe 526 kVA of PLN electrical power. In order to make the power factor of 0.9, bank capacitor of 600 kVAR be installed with the combination of 10 x 6 kVAR.
      URI
      http://repository.umy.ac.id/handle/123456789/29022
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV