      PERANCANGAN SISTEM INSTALASI LISTRIK GEDUNG HOTEL AR+OTEL YOGYAKARTA

      Thumbnail
      View/Open
      COVER (191.8Kb)
      HALAMAN JUDUL (837.2Kb)
      HALAMAN PENGESAHAN (276.8Kb)
      ABSTRAK (284.8Kb)
      BAB I (301.4Kb)
      BAB II (1.203Mb)
      BAB III (184.9Kb)
      BAB IV (1.831Mb)
      BAB V (414.3Kb)
      DAFTAR PUSTAKA (288.1Kb)
      LAMPIRAN (5.915Mb)
      NASKAH PUBLIKASI (1.218Mb)
      Date
      2019-03-23
      Author
      ULFA, EMYA FARIHA
      Metadata
      Show full item record
      Abstract
      Electric installation design is the most important part in a multi-storey building functioned as a layout for tools that used electric as its operational, by calculating resistance, current, and power, so the use of electrical power can work well and appropriate. In the Ar+otel Hotel, Yogyakarta, the designer designed 9 floors of the installation not including the rooftop and basement, the design covered some tools such as lighting, outlet, VAC electrical power supply (arrangement of air and mechanical ventilation); electric charge (MATV, CCTV, lift, telephone, fire alarm, and sound system); electrical device supplies (clean water pump, hydrant pump, fire pump, hot water pump, Pressurized fan, summit pump, deep weel); low voltage installation, and generator set installation or transformer. After did the calculation of the Ar+otel Hotel electric installation, it produced the installed entire charge of 405.213 KW and the reactive power amounted to 506.516 kVA with 0.8 of the cosphi (as stated in MEP). Based on the power that had been produced, the transformer and generator capacity used to 630 kVA. By the 20 kV of middling voltage in installed PLN supply, 555 kVA power capacity, 3 phases, 50 Hz. The used transformer and generator was 630 kVA. In order to repair the power factor became 0.9 with the charge of 450.326 kVA, it was done by installing the bank capacitor of 100 kVAr with the combination of 10 step x 10 kVAr.
      URI
      http://repository.umy.ac.id/handle/123456789/29038
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV