View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS POTENSI PEMANFAATAN ENERGI TENAGA SURYA SEBAGAI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) FOTOVOLTAIK DALAM PENYEDIAAN ENERGI LISTRIK DI KABUPATEN CILACAP

      Thumbnail
      View/Open
      COVER (82.58Kb)
      HALAMAN JUDUL (409.7Kb)
      HALAMAN PENGESAHAN (609.7Kb)
      ABSTRAK (60.55Kb)
      BAB I (139.7Kb)
      BAB II (660.5Kb)
      BAB III (254.9Kb)
      BAB IV (951.1Kb)
      BAB V (59.83Kb)
      DAFTAR PUSTAKA (124.2Kb)
      LAMPIRAN (1.975Mb)
      NASKAH PUBLIKASI (792.5Kb)
      Date
      2019-03-12
      Author
      ALWI, FADHILLA
      Metadata
      Show full item record
      Abstract
      This communal PLTS system is designed to meet the electricity needs of RT 07 RW 05 Tambakreja, Cilacap Selatan, Cilacap. The design of this communal PLTS system uses a general design based on solar irradiation data and load requirements. Electrical energy needs for public facilities and social facilities. The result of calculations and analysis carried out, design of the communal PLTS system is designed to meet the electricity need of public facility and social facility. Communal PLTS with a capacity of 21,6 kWp that is capable of demand electrical energy requirements of 54 kWh/day. Design of this communal PLTS system uses a 200 Wp solar panel with 108 solae panels and 96 batteries with a capacity of 1000 Ah. The investment cost needed for design of communal PLTS Rp 1.679.125.016, the operational and maintenance costs are Rp 82.5000.000. When using communal PLTS electricity requires a fee Rp 16.631.354/month, whereas when using PLN electricity it only cost Rp 2.376.993/month. By using communal PLTS, it can reduce the potential of carbon dioxide emmisions by 14,2 ton 𝐶02 per years.
      URI
      http://repository.umy.ac.id/handle/123456789/29070
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV