      STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PEKERJAAN PENAMBAHAN LAJUR RUAS KOPO – BUAH BATU JALUR B PADA JALAN TOL PADALARANG - CILEUNYI

      Thumbnail
      View/Open
      COVER (107.3Kb)
      HALAMAN JUDUL (434.7Kb)
      HALAMAN PENGESAHAN (178.4Kb)
      ABSTRAK (134.0Kb)
      BAB I (79.33Kb)
      BAB II (227.7Kb)
      BAB III (94.31Kb)
      BAB IV (1.006Mb)
      BAB V (76.21Kb)
      BAB VI (14.46Kb)
      DAFTAR PUSTAKA (11.89Kb)
      NASKAH PUBLIKASI (907.8Kb)
      Date
      2019-07-04
      Author
      ALAM, HAYYA SYAH
      Metadata
      Show full item record
      Abstract
      A project that called successful were made by on time schedule and appropriate cost. by made it haste and compressing the cost of project without decreasing the quality of works, that will guide us to avoid project failure or get fined because of works delayed. The purpose of this research is to analyzing both of time crashing and budget cost in the project of “Penambahan Lajur Ruas Kopo – Buah Batu Jalur B pada Jalan Tol Padalarang – Cileunyi” by using microsoft project 2019. The result showed that time and cost acquired after increasing overtime of worker in 1hour lead to decreasing of duration at 309,64 days with Rp. 86.946.677.481,54, after that increasing overtime in 2hour lead to decreasing of duration at 241,42 days with Rp. 86.138.733.058,58, and then increasing overtime in 3hour lead to decreasing of duration at 202,08 days with Rp.86.123.588.025,02. In the addition of heavy equipment and increasing overtime in 1hour lead to decreasing of duration at 309,64 days with Rp. 86.739.920.622,76, after that increasing overtime in 2 hour lead to decreasing of duration 241,42 days with Rp.85.738.758.231,67, and then increasing overtime in 3 hour lead to decreasing of duration at 202,08 days with Rp.85.161.383.401,72. The result of this research acquired that increasing the number and overtime of heavy equipment is more efective for project crashing in 202,08 days and the cost consumption will be at Rp.85.161.383.401,72.
      URI
      http://repository.umy.ac.id/handle/123456789/30128
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV