View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      UNJUK KERJA GENERATOR SET (GENSET) SEBAGAI BACK UP DAYA ENERGI LISTRIK PADA GEDUNG RAMAI MALL YOGYAKARTA

      Thumbnail
      View/Open
      COVER (22.80Kb)
      HALAMAN JUDUL (1.822Mb)
      HALAMAN PENGESAHAN (740.5Kb)
      ABSTRAK (180.3Kb)
      BAB I (191.5Kb)
      BAB II (615.3Kb)
      BAB III (179.0Kb)
      BAB IV (701.5Kb)
      BAB V (182.3Kb)
      DAFTAR PUSTAKA (203.2Kb)
      LAMPIRAN (171.5Kb)
      NASKAH PUBLIKASI (663.2Kb)
      Date
      2020-01-08
      Author
      RAMADHAN, ANDRIAN WAHYU
      Metadata
      Show full item record
      Abstract
      The Ramai Mall Yogyakarta is one of building which is using the electric source from PLN. However, the electric source from PLN cannot supply continuously without several problems. Therefore, in order to anticipate those problems, we need a backup system as a generator set to keep on the electric energy of the building. Generator set works automatically, when the electric source from PLN cannot be used, the generator set turn on automatically. Then, when the electric source from PLN can be accessed, the generator set turn off automatically. Because of the backup system in The Ramai Mall Yogyakarta had worked for a long time, we need to evaluate and reanalyze the backup system of the building in order to make the system run well. The analyzing of the system applies quantitative approach and it is supported with ETAP I2, 6. 0. Simulation Program which simulates from the result of calculation, the components of the backup system is suitable with PUIL 2000 requirements. However, the efficient degree of the generator set of the building is low 48, 5% because the loading of the generator set is low. According to the result of simulation, the loading which have to be supplied by generator set is 865 kVA and the capacity which is used by generator set is 1000 kVA. In this case, the generator set works in its ability.
      URI
      http://repository.umy.ac.id/handle/123456789/31339
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV