INVESTIGASI UNJUK KERJA PROSES PEMANASAN DAN HUMIDIFIKASI PADA AIR CONDITIONING UNIT A660
Date
2010Author
TRI WIDIASTOKO, BAGUS
NADJIB, MUHAMMAD H
SANTOSA, TITO HADJI AGUNG
Metadata
Show full item recordAbstract
Air conditioning instrument is one solution to create the conditions of a place as you wish. Application of air
conditioning equipment used in houses, offices, market, transportation and other applications where human
comfort is not a primary consideration, such as: computers, laboratories, photography, chemical industry,
farming, food storage, etc. Hilton Air Conditioning Laboratory Unit A660 contained in the Laboratory of
Machine Engineering Muhammadiyah University of Yogyakarta (UMY) provide settings for air conditioning
process that can be demonstrated and investigated. performance of maximal heating humidification of Hilton
Air Conditioning Laboratory Unit A660 need to know by doing this research. The thermocouples had
calibrated with standard thermometer before the tests performed. There are several variation was performed
in the pre-heater and re-heater (0kW, 1kW, 2kW). The testing also involved with boiler various 0kW, 2kW
and 3kW. The analysis of research used adiabatic saturation assumption where the parameters used were
dry bulb temperature (TDB) and wet bulb temperature (TWB) obtained from the test data acquisition.The
results showed that the greater power of heater the greater the temperature of dry bulb (TDB) which also
affects the increase in enthalphy. Meanwhile, the greater the power boiler that is used causes increased
levels of water vapor in the air as shown by the increase in wet bulb temperature wet (TWB) and absolute
humidity of air. Warming maximum of 67.5 ° C occurred on fan voltage 100Volt, 0kW boiler, 2kW pre-heater
and 1kW re-heater. Maximum quantity of water vapor contained in the duct of 0.0313kgH2O/kg Dry air
reached on B suction with fan variation 100Volt, 5kW boiler, pre-heater 2kW, re-heater 2kW.