Browsing Students by Subject "duration, cost, microsoft project, and time cost trade off."
Now showing items 1-1 of 1
-
STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK GEDUNG
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-04-24)The time and cost optimizations are very important to be understood in a construction project planning. By knowing these, the time and cost in a project can be measured to obtain maximum profit. The aim of this study is ...