      STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK GEDUNG

      Thumbnail
      View/Open
      COVER (63.28Kb)
      HALAMAN JUDUL (900.9Kb)
      HALAMAN PENGESAHAN (184.5Kb)
      ABSTRAK (17.84Kb)
      BAB I (132.6Kb)
      BAB II (344.8Kb)
      BAB III (32.87Kb)
      BAB IV (1.425Mb)
      BAB V (129.3Kb)
      DAFTAR PUSTAKA (18.33Kb)
      LAMPIRAN (488.6Kb)
      NASKAH PUBLIKASI (807.5Kb)
      Date
      2019-04-24
      Author
      SANTOSO, SEPTHIA RAHMADA
      Metadata
      Show full item record
      Abstract
      The time and cost optimizations are very important to be understood in a construction project planning. By knowing these, the time and cost in a project can be measured to obtain maximum profit. The aim of this study is to obtain the result of velocity duration to find out the change in project cost with additional working hours (overtime) and additional workforce, then conduct a comparison in order to get effective result. This study employed the time cost trade off method and used Microsoft Project 2010 program. The findings of the study showed that in normal condition with the project duration of 147 days has a normal total project cost of Rp 3.672.736.653,00. Meanwhile, in 1 hour overtime with the project duration of 103,73 days has a total project cost of Rp 3.487.750.911,17. In 2 hours overtime with the project duration of 71,37 days has a total project cost of Rp 3.350.013.645,22. Additionally, in 3 hours overtime with the project duration of 46,79 days has a total project cost of Rp 3.245.993.154,92. As for the workforce addition of 1 hour overtime has a duration of 103,73 days and costs around Rp 3.485.565.135,38. The workforce addition of 2 hours overtime has a duration of 71,37 days and costs around Rp 3.345.096.104,11. Meanwhile, the workforce addition of 3 hours overtime has a duration of 46,79 days and costs around Rp 3.238.026.956,81. Therefore, the cheapest cost with the fastest duration found in the 3 hours overtime workforce addition with duration of 46,79 days and cost of Rp 3.238.026.956,81.
      URI
      http://repository.umy.ac.id/handle/123456789/27669
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV