Toggle navigation
Toggle navigation
View Item
UMY Repository
03. DISSERTATIONS AND THESIS
Students
Undergraduate Thesis
Faculty of Engineering
Department of Civil Engineering
View Item
UMY Repository
03. DISSERTATIONS AND THESIS
Students
Undergraduate Thesis
Faculty of Engineering
Department of Civil Engineering
View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.
STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PEMASANGAN PIPA PDAM DIY
View/
Open
COVER (110.2Kb)
HALAMAN JUDUL (169.7Kb)
HALAMAN PENGESAHAN (196.8Kb)
INTISARI (86.41Kb)
BAB I (200.6Kb)
BAB II (99.19Kb)
BAB III (611.7Kb)
BAB IV (100.7Kb)
BAB V (1.083Mb)
BAB VI (93.34Kb)
DAFTAR PUSTAKA (90.49Kb)
LAMPIRAN (485.8Kb)
Date
2017-12
Author
RENALDI, RENALDI
Metadata
Show full item record
URI
http://repository.umy.ac.id/handle/123456789/17415
Collections
Department of Civil Engineering
Search UMY Repository
This Collection
Browse
All of UMY Repository
Collections
By Issue Date
Authors
Titles
Subjects
This Collection
By Issue Date
Authors
Titles
Subjects
My Account
Login