Search 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Search
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Search
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Search

      Show Advanced FiltersHide Advanced Filters

      Filters

      Use filters to refine the search results.

      Now showing items 1-1 of 1

      • Sort Options:
      • Relevance
      • Title Asc
      • Title Desc
      • Issue Date Asc
      • Issue Date Desc
      • Results Per Page:
      • 5
      • 10
      • 20
      • 40
      • 60
      • 80
      • 100
      Thumbnail

      EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JALAN DAN JEMBATAN NGALANG -NGUWOT – GADING 

      UTAMI, DESTA RIYAN (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-10-30)
      Keberhasilan dari suatu proyek dilihat dari waktu penyelesaian yang singkat dan biaya yang dikeluarkan sedikit. Pengelolaan suatu proyek yang sistematis diperlukan untuk memastikan waktu pelaksanaan proyek sesuai dengan ...

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Discover

      Author
      UTAMI, DESTA RIYAN (1)
      SubjectDuration Cost Trade Off , Microsoft Project 2010, Penambahan Jam Lembur, dan penambahan tenaga kerja. (1)... View MoreDate Issued
      2018 (1)

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV