dc.descriptionPLTA Wadaslintang merupakan pembangkit listrik tenaga air dengan kemampuan produksi listrik sebanyak 2 X 9 MW dan memproduksi 92 juta KWH setiap tahunnya. Pada turbin dan generator masing-masing mempunyai banyak permasalahan termasuk permasalahan tentang efisiensi turbin dan generator. Efisiensi turbin merupakan unjuk kerja suatu mesin turbin untuk menghasilkan suatu daya dimana perbandingan yang dihasilkan dengan kinerja mesin turbin. Efisiensi generator adalah perbandingan daya keluaran atau daya masukan generator. Pada tabel perhitungan efisiensi dapat disimpulkan bahwa turbin bekerja baik dan secara optimal. Dikarenakan nilai efisiensi turbin tidak kurang dari 50%. Nilai daya turbin turun karena pada nilai elevasi intake rendah, begitupun sebaliknya. Hari pertama efisiensi generator yang didapatkan dari hasil perhitungan adalah 89,77%, hari kedua 89,77%, hari ketiga 91,02%, hari keempat 91,25%, dan hari kelima 91,59%. perbandingan efisiensi hari pertama, kedua, ketiga, keempat, dan kelima adalah pada beban. hal ini dikarenakan pada beban mengalami perubahan nilai arus setiap harinya. Sehingga pada beban mengalami perubahan. Perubahan beban tersebut merupakan suatu realitas dalam batas wajar. Dari kondisi itu dapat disimpulkan bahwa efisiensi turbin dan generator sinkron di PLTA Wadaslintang berada dalam kondisi baik dan bekerja secara optimal.en_US
dc.description.abstractWadaslintang Hydroelectric Power Plant is a hydroelectric power plant with electricity production capacity of 2 X 9 MW and producing 92 million KWH annually. In turbines and generators each has many problems including problems regarding the efficiency of turbines and generators. Turbine efficiency is the performance of a turbine engine to produce a power where the ratio is produced with the performance of the turbine engine. The efficiency of the generator is the ratio of the output power or the input power of the generator. In the efficiency calculation table, it can be concluded that the turbine works well and optimally. Because the value of turbine efficiency is not less than 50%. The turbine power value decreases because at low intake elevation values, vice versa. The first day the generator efficiency obtained from the calculation was 89.77%, the second day 89.77%, the third day 91.02%, the fourth day 91.25%, and the fifth day 91.59%. comparison of the efficiency of the first, second, third, fourth, and fifth days is on the load. this is because the load changes the current value every day. So that the load changes. The change in burden is a reality within reasonable limits. From these conditions it can be concluded that the efficiency of the turbine and synchronous generator in the Wadaslintang hydropower plant is in good condition and works optimally.en_US
dc.publisherFAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTAen_US
dc.subjectTurbine Efficiency, Generator Effeciency, Turbine, Synchronous Generatoen_US
dc.titleANALISIS PERHITUNGAN EFISIENSI TURBIN DAN GENERATOR DI PLTA WADASLINTANGen_US
dc.typeThesis SKR F T 532en_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record