View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PEMODELAN LALU LINTAS AKIBAT DAMPAK KEGIATAN RESTORAN TEMPO GELATO JALAN TAMAN SISWA YOGYAKARTA

      Thumbnail
      View/Open
      COVER (55.92Kb)
      HALAMAN JUDUL (301.6Kb)
      HALAMAN PENGESAHAN (236.3Kb)
      ABSTRAK (9.622Kb)
      BAB I (13.44Kb)
      BAB II (170.3Kb)
      BAB III (1.754Mb)
      BAB IV (1.850Mb)
      BAB V (8.572Kb)
      DAFTAR PUSTAKA (86.01Kb)
      LAMPIRAN (810.9Kb)
      NASKAH PUBLIKASI (643.4Kb)
      Date
      2019-03-28
      Author
      ARYANTO, ANDRI
      Metadata
      Show full item record
      Abstract
      Economy in Yogyakarta is growing more from year to year. One of the most popular business is culinary. One of them is Tempo Gelato. Build the restaurant having many effect for traffic around the Tempo Gelato location. Need to do microsimulation to decided the effect of traffic around the location with modelling. Therefore for this research methodology modelling method used PTV. Vissim 9 in intersection and road segment at Taman Siswa street based on traffic survey counting. For the result existing condition of Taman Siswa gets the result long queues average is 35 m, delays is 94 second, and LOS F. For the road segment get the result long queues is 1.02 m, delays is 9 second, and LOS A. For the 2018 operational condition Taman Siswa intersection get the result long queues is 39 m, delays is 82.82 second, and LOS F. For the road segment get the result long queues is 1.26 m, delays is 8.1 second, and LOS A. After give the alternative to make the road become one way road, Taman Siswa intersection get the result long queues is 12.12 m, delays is 58.77 second, and LOS E. For road segment get the result long queues is 3.25 m, delays is 6.18 second, and LOS A. The service level at road segment increase from F to E.
      URI
      http://repository.umy.ac.id/handle/123456789/25985
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV