      KAJIAN FAKTOR RISIKO KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG BERTINGKAT TINGGI DI YOGYAKARTA

      Thumbnail
      View/Open
      COVER (56.78Kb)
      HALAMAN JUDUL (135.0Kb)
      HALAMAN PENGESAHAN (206.3Kb)
      ABSTRAK (10.33Kb)
      BAB I (12.96Kb)
      BAB II (212.3Kb)
      BAB III (85.07Kb)
      BAB IV (1.370Mb)
      BAB V (7.789Kb)
      DAFTAR PUSTAKA (8.652Kb)
      LAMPIRAN (7.995Kb)
      NASKAH PUBLIKASI (520.6Kb)
      Date
      2019-07-24
      Author
      APRIANTO, ARIEF RAHMAN
      Metadata
      Show full item record
      Abstract
      A risk is an adverse event or that is harmful and has a negative impact on the project. Risk is directly related to the possibility of unexpected events or events. Risk identification aims to identify all possible hazards or risks that might occur in the activity environment and how the severity of the impact. In general, the construction of this building has many risks, including the risk of work delays. This study aims to analyze what factors influence the duration of work. In this study, data is taken from the Work Breakdown Structure originating from a hotel development project, then analyzed by creating a network planning using the Activity On Note (AON) method after which critical paths and critical activities are obtained. This critical activity will identify events and impacts. Assessment of events and impacts is carried out by interviewing relevant parties by filling out questionnaires based on experience and events in the field. The results are obtained from the identification of events (events) and impacts (impact) of each job that is in the project, then the data is processed using the Risk = event x Impact approach whose results are displayed with the Risk Matrix. The results of data processing in this study indicate that high-risk jobs causing delays in the project are earthwork activities with a mean risk value of 7.2 and preparation activities with an average risk score of 5.8. Both of these jobs are in the moderate risk category.
      URI
      http://repository.umy.ac.id/handle/123456789/28758
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV