dc.descriptionGardu Induk 150KV Wates adalah Gardu Induk di kabupaten Kulon progo kecamatan Wates yang menyuplay energy listrik daerah kulon progo salah satunya adalah menyuplay di area NYIA (New Yogyakarta International Airport) yang dimana merupakan proyek bandara baru yang diperkirakan membutuhkan suplay daya energy listrik sekitar 20MW untuk mengatasi adanya kelebihan kapasitas beban pada Transformator tenaga di gardu induk 150KV Wates maka dibutuhkan perkiraan beban puncak beberapa tahun yang akan datang untuk mencegah hal tersebut Perkiraan beban puncak transformator tenaga di Gardu Induk 150KV Wates dalam beberapa tahun ke depan dapat diprediksi dengan menggunakan metode Jaringan Syaraf Tiruan backpropagation. Jaringan Syaraf Tiruan backpropagation merupakan sistem kecerdasan tiruan dengan kemampuan belajar dan menghimpun pengetahuan hasil pembelajaran dalam jaringan selnya (neuron) sehingga memungkinkan jaringan secara keseluruhan semakin cerdas merespon masukan/inputan yang diberikan. Kemampuan belajar dan mengakumulasi pengetahuan ini memungkinkan sistem jaringan syaraf tiruan untuk dapat beradaptasi dengan lingkungan yang memberikan input kepadanya. Layaknya otak manusia dalam merespon kondisi lingkungan yang berbeda-beda, peranan JST dalam bidang penelitian dan pengembangan sangat penting di masa mendatang yang menuntut aspek otomatisasi dan aspek interaktif serta aspek kecepatan antara alat dan manusia. Perkiraan beban puncak transformator tenaga ini didasarkan pada pertumbuhan konsumsi energi dan pertumbuhan ekonomi serta pertumbuhan penduduk sedangkan data yang digunakan adalah data historis dari tahun 2014 sampai dengan tahun 2018 yang kemudian diolah menjadi data inputan untuk memperkirakan beban puncak transformator tenaga pada gardu induk 150KV Wates dengan menggunakan metode jaringan syaraf tiruan backpropagation.en_US
dc.description.abstractThe 150KV Wates Substation is the Substation in Kulon Progo district, Wates sub-district which supplies electrical energy in the Kulon Progo area, one of which is supply in the NYIA area (New Yogyakarta International Airport) which is a new airport project which is estimated to require around 20MW of electricity if there is an excess load capacity on the power transformer at the 150KV Wates substation, it will require an estimated peak load in the next few years to prevent this The estimated peak load of the power transformer in the 150KV Wates Substation in the next few years can be predicted using the backpropagation Artificial Neural Network method. Backpropagation Artificial Neural Network is an artificial intelligence system with the ability to learn and gather knowledge of learning outcomes in its cell network (neurons) so as to enable the network as a whole to be more intelligent in responding to input / input given. The ability to learn and accumulate this knowledge allows artificial neural network systems to be able to adapt to the environment that provides input to it. Like the human brain in response to different environmental conditions, the role of ANN in the field of research and development is very important in the future that demands aspects of automation and interactive aspects as well as aspects of speed between tools and humans. The estimated peak load of the power transformer is based on growth in energy consumption and economic growth and population growth while the data used are historical data from 2014 to 2018 which are then processed into input data to estimate the peak load of power transformers at 150KV Wates substations using backpropagation neural network method.en_US
dc.publisherFAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTAen_US
dc.subjectElectricity, Estimates, Artificial Neural Networksen_US
dc.titleANALISIS PRAKIRAAN BEBAN PUNCAK PADA GARDU INDUK WATES DENGAN METODE JARINGAN SYARAF TIRUAN BACKPROPAGATIONen_US
dc.typeThesis SKR 187en_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record