dc.description | Rumah sakit merupakan sarana pelayanan kesehatan yang disediakan oleh
pemerintah maupun swasta untuk melayani masyarakan diupayakan untuk
mengutamakan komitmen untuk memberi rasa aman dan nyaman kepada
masyarakat, sebuah bangunan rumah sakit harus dibuat aman dan nyaman sehingga
para pasien yang sedang dirawat didalamnya. Rasa aman tersebut timbul dari sarana
dan prasarana yang mendukung, salah satunya bagian insatalasi rumah sakit.
Instalasi rumah sakit meliputi beberapa aspek antara lain adalah sistem
distribusi listrik, pencahayaan buatan (Penerangan), kotak kontak, penyalur petir,
dan infrastruktur lainya. Oleh karena itu upaya untuk mengurangi over design,
dibuatlah sebuah sisitem instalasi listrik rumah sakit yang mengolah data untuk
menghitung beban keseluruhan gedung rumah sakit secara rinci dan akurat serta
selalu sesuai dengan SNI (Standar Nasional Indonesia). Diharapkan dengan adanya
perencanaan sistem instalasi listrik ini mampu menunjang sarana dan prasarana
yang memadai bagi pengguna gedung.
Setelah dilakukannya perancanagan instalasi listrik pada Ruamah Sakit
Panti Rahayu, maka hasil perhitungan beban listrik yang terpasang adalah sebesar
1331,4 kVA, dimana dengan adanya faktor keserempakan terhadap beban sebesar
70% didapatkan beban maksimal sebesar 794,4 kVA dengan nilai cos 𝜑 0,72.
Untuk perbaikan nilai cos 𝜑 maka diperlukan kapasitor bank berkapasitas 300
kVAR dengan kombinasi 12 dikali 25 kVAR pada masing masing kapasitor
sehingga beban normal yang di dapat sebesar 626,7 kVAR dengan cos 𝜑 0,9. Suplai
daya langganan PLN yang diperlukan pada rumah sakit ini sebesar 865 kVA.
Berdasarkan perhitungan total beban setelah perbaikan faktor daya, kapasitas
generator yang akan dipasang sebesar 1000 kVA dan kapasitas trafo yang akan
dipasang sebesar 1250 kVA.
Kata kunci: Instalasi Listrik, Pencahayaan buatan (Penerangan), kotak kontak,
Sistem Distribusi Listrik, Arus Hubung Singkat, Drop Tegangan, Rumah Sakit,
Gedung Bertingkat | en_US |
dc.description.abstract | Hospital is a health service facility provided by the government and the
private sector to serve the community strived to prioritize the commitment to
provide security and comfort to the community, a hospital building must be made
safe and comfortable so that the patients who are being treated therein. The feeling
of security arises from the supporting facilities and infrastructure, one of them is
the hospital's installation.
Hospital installations include several aspects including the electricity
distribution system, artificial lighting (lighting), contact boxes, lightning suppliers,
and other infrastructure. Therefore, an effort to reduce over design, a hospital
electrical installation system is made which processes data to calculate the overall
load of the hospital building in a detailed and accurate way and always complies
with SNI (Indonesian National Standard). It is expected that with the planning of
the electrical installation system is able to support adequate facilities and
infrastructure for building users.
After planning the electrical installation at the Panti Rahayu Hospital, then
the results of the calculation of the installed electrical load is 1331.4 kVA, where
with the simultaneity of a load of 70%, the maximum load is 794.4 kVA with a cos
cos 0.72 value . To improve the value of cos φ then a capacitor bank of 300 kVAR
is needed with a combination of 12 times 25 kVAR on each capacitor so that the
normal load can be 626.7 kVAR with cos φ 0.9. The required PLN subscription
power supply at this hospital is 865 kVA. Based on the calculation of the total load
after repairing the power factor, the capacity of the generator to be installed is
1000 kVA and the capacity of the transformer to be installed is 1250 kVA. | en_US |
dc.publisher | FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA | en_US |
dc.subject | Electrical Installation, Artificial Lighting (Lighting), contact box, Electrical Distribution System, Short Circuit Current, Voltage Drop, Hospital, Multi-storey Buildings. | en_US |
dc.title | PERANCANGAN INSTALASI LISTRIK GEDUNG PELAYANAN TERPADU RUMAH SAKIT PANTI RAHAYU GUNUNG KIDUL YOGYAKARTA | en_US |
dc.type | Thesis
SKR
78 | en_US |