dc.contributor.advisorZULFIAR, MUHAMMAD HERI
dc.contributor.authorKAMUK, IDHAM ZULFIKAR
dc.date.accessioned2019-11-08T06:47:49Z
dc.date.available2019-11-08T06:47:49Z
dc.date.issued2019-09-28
dc.identifier.urihttp://repository.umy.ac.id/handle/123456789/30296
dc.descriptionDalam proses pelaksanaan pekerjaan konstruksi, seringkali mengalami beberapa hambatan ataupun kendala. Pekerjaan konstruksi merupakan salah satu pekerjaan yang mempunyai risiko terutama pada tahap pelaksanaan konstruksi. Proses ini biasanya membutuhkan waktu cukup lama dan kompleks sehingga dapat menimbulkan terjadinya penyimpangan mutu yang pada akhirnya akan menimbulkan berbagai macam risiko. Penerapan mutu merupakan usaha sistematis untuk memenuhi standar sesuai dengan sasaran perencanaan, merancang sistem informasi, membandingkan pelaksanaan dengan menganalisis kemungkinan adanya penyimpangan, kemudian mengambil tindakan pembetulan agar sumber daya dapat digunakan secara efektif dan efisien dalam mencapai sasaran. Tujuan dari penelitian ini adalah melakukan penilaian terhadap penyimpangan mutu kerja pada pelaksanaan pekerjaan struktur kolom, balok dan plat lantai pada tahap pembangunan Hotel Grand Keisha Yogyakarta. Metode yang digunakan dalam penelitian ini menggunakan analisis secara kualitatif dengan pendekatan penilaian risiko. Dari hasil analisis didapatkan bahwa penyimpangan mutu kerja pada tahap pekerjaan struktur kolom, balok dan plat lantai pada tahap pembangunan Hotel Grand Keisha Yogyakarta masuk dalam kategori level sedang, ini membuktikan bahwa penerapan mutu telah dilaksanakan dan dijalankan serta diselesaikan dengan baik sesuai dengan metode dan prosedur. Manajemen proyek secara keseluruhan telah berhasil mengelola, mengarahkan serta mengendalikan seluruh rangkaian kegiatan secara efektif untuk meningkatkan produktifitas dalam hal kinerja penerapan mutu.en_US
dc.description.abstractIn the process of carrying out construction work, we often encounter several obstacles or obstacles. Construction work is one of the jobs that has risks, especially during the construction phase. This process usually takes a long time and is complex so that it can lead to quality deviations which will eventually lead to various risks. Quality implementation is a systematic effort to meet standards in accordance with the objectives of planning, designing information systems, comparing implementation by analyzing the possibility of irregularities, then taking corrective actions so that resources can be used effectively and efficiently in achieving targets. The purpose of this study is to assess the quality deviation of work on the implementation of column, beam and floor plate structure work at the stage of construction of the Grand Keisha Hotel Yogyakarta. The method used in this study uses analysis qualitatively with a risk assessment approach. From the results of the analysis, it was found that the deviation of work quality at the stage of column structure work, beams and floor plates at the construction stage of the Grand Keisha Hotel Yogyakarta was included in the medium level category, proving that the implementation of quality was carried out and carried out properly according to methods and procedures. Project management as a whole has managed to manage, direct and control the entire set of activities effectively to increase productivity in terms of performance quality implementation.en_US
dc.publisherFAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTAen_US
dc.subjectConstruction Projects, Project Management, Quality Implementation, Risken_US
dc.titleEVALUASI PENERAPAN MUTU PADA PELAKSANAAN PEMBANGUNAN GEDUNG SEMBILAN LANTAIen_US
dc.title.alternativeStudi Kasus Proyek Pembangunan Hotel Grand Keisha Yogyakartaen_US
dc.typeThesis SKR FT 367en_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record