Browsing 03. DISSERTATIONS AND THESIS by Subject "time cost trade off, addition working hours (overtime), addition of heavy equipment, duration, cost."
Now showing items 1-1 of 1
-
STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK KONSTRUKSI PEMBANGUNAN JEMBATAN KALI KABUYUTAN
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-02)The success of a project can be seen from a short duration and small cost. A project managed systematically so that the timing of the work can be ascertained to be the same as planned or can be accelerated from the ...