View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA OFF-GRID DIATAP PARKIRAN MOTOR GEDUNG ADMISI UNIVERSITAS MUHAMMADIYAH YOGYAKARTA

      Thumbnail
      View/Open
      COVER (84.82Kb)
      HALAMAN JUDUL (2.799Mb)
      HALAMAN PENGESAHAN (6.609Mb)
      ABSTRACT (96.93Kb)
      BAB I (107.0Kb)
      BAB II (786.2Kb)
      BAB III (417.3Kb)
      BAB IV (1001.Kb)
      BAB V (94.60Kb)
      DAFTAR PUSTAKA (162.5Kb)
      LAMPIRAN (1.204Mb)
      NASKAH PUBLIKASI (544.2Kb)
      Date
      2018-05-27
      Author
      ARFIANTO, FEBRI
      Metadata
      Show full item record
      Abstract
      Off-Grid PLTS system is designed to meet the electricity needs of Admission Building of Muhammadiyah University of Yogyakarta, but Off-Grid PLTS planning does not take into account the burden used in Admission Building of Muhammadiyah University of Yogyakarta, but take into account the area of land that will be used for placement of PLTS Off components -Grid. Planning Off-Grid PLTS is done by identifying the roof layout of motorcycle Admission Building, then made an ideal design with equipment specifications on the market. After doing the calculation of the required cost and also calculation of electrical energy generated for economic analysis, if the electrical energy is sold directly to the PLN. The area used by PLTS Off-Grid planning is ± 1.192m2, of total area with area of ± 3.365m2 Off-Grid PLTS uses 48V system, it can be installed solar panel with capacity of 120 WP as much as 280 pieces, Battery 12V 200A 336 pieces, Solar Charge Controller 60A as many as 14 pieces and 10.000W Inverter as much as 14 pieces. The power generated from Off-Grid PLTS is 134.4 kWh per year. Total initial investment required in PLTS Off-Grid planning is Rp. 2.234.014.063 and also requires maintenance of PLTS of Rp. 17.872.112,5 per year. Data from the Economic Analysis result shows that Pay Back Period will be achieved for 13 years 2 months and also the NPV value of the investment is positive. When compared with the average estimation of solar panel usage life of 25 years, it can be concluded that making Off-Grid Off-PLTS by using this plan will generate good income for the future.
      URI
      http://repository.umy.ac.id/handle/123456789/20647
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV