View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS KETAHANAN KOMPONEN-KOMPONEN LISTRIK PEMBANGKIT LISTRIK TENAGA ANGIN DI PLTH BAYU BARU BANTUL YOGYAKARTA

      Thumbnail
      View/Open
      COVER (39.15Kb)
      HALAMAN JUDUL (562.4Kb)
      HALAMAN PENGESAHAN (218.5Kb)
      ABSTRACT (12.06Kb)
      BAB I (126.6Kb)
      BAB II (811.8Kb)
      BAB III (200.0Kb)
      BAB IV (710.1Kb)
      BAB V (13.64Kb)
      DAFTAR PUSTAKA (112.6Kb)
      LAMPIRAN (291.0Kb)
      NASKAH PUBLIKASI (490.3Kb)
      Date
      2018-05-28
      Author
      PRATAMA, OGI AUFAR
      Metadata
      Show full item record
      Abstract
      Wind energy is an alternative energy sources renewable that can be used to replace the source of energy not renewable, such as fossil fuels that are still very widely used to date, especially in Indonesia. In an effort to reduce the use of fossil-fueled energy sources, the government develops renewable alternative energy by building Wind Power Generation (PLTB) in PLTH Bayu Baru. This study aims to determine the current condition of the Wind Power Generation in PLTH Bayu Baru, in terms of systems, current conditions electrical components and electrical terms based on manual calculations. The results of this study indicate the state of the PLTH system which initially synergizes wind energy and solar energy, now working separately due to component malfunction. Currently only 1 kW / 240 V wind turbine of 14 units is located in the working western group which is functioned to serve 40 PJU lamps, the wind turbine is capable of producing energy of 8.434 kWh up to 12.4 kWh per day so that it can meet the needs of the load of 8.28 kW.
      URI
      http://repository.umy.ac.id/handle/123456789/20698
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV